This is a locked chapter<<#105>> The Engineer's Switch
About This Chapter
In this brief scene, the lunar landing engineers discuss the problems they've had with their rover. They've only got five more days before the landing, so they're not too happy about it. One of the engineers mentions that the other rover builders are using a fly-back rover instead of a rover. The other guys are using an aerial form, which means they'll have to land the rover on the moon itself. The engineers decide to solve their rover problem first, since they can't build a rover that can jump over obstacles. The only thing they could do is to make the tires bigger, but that would be too heavy, and it would take too long to build. So they make the wheels out of sponge, which is light and cheap. The next problem is to build a landing chute for the rover.
This is a locked chapter<<#105>> The Engineer's Switch
About This Chapter
In this brief scene, the lunar landing engineers discuss the problems they've had with their rover. They've only got five more days before the landing, so they're not too happy about it. One of the engineers mentions that the other rover builders are using a fly-back rover instead of a rover. The other guys are using an aerial form, which means they'll have to land the rover on the moon itself. The engineers decide to solve their rover problem first, since they can't build a rover that can jump over obstacles. The only thing they could do is to make the tires bigger, but that would be too heavy, and it would take too long to build. So they make the wheels out of sponge, which is light and cheap. The next problem is to build a landing chute for the rover.